Take a look at our upcoming projects to get information on bidding for sub contracting work.

Bid Date Bid Time Project Name Information Project Location Total Cost Architect Estimator Plans Available Addenda Issued

Cheyenne, WY

  • 06-01-2017 02:00 PM Scotts Bluff County Detention Center Renovation and Addition Stories: Two at adult housing unit including for added mezzanine within the unit; and single story for new medical addition, new storage addition, existing juvenile housing unit, administration and detention support. Approximate Area: 4,450 square feet of new addition construction with 56,822 square feet of  existing building for a total completed square footage of 61,272 square feet. Occupancy: I-3 and B.

    Construction Type: Type IIB. 
    Foundations: Spread footings. Structure: Cast-in-place concrete, structural steel framing, steel bar joists and metal deck. Exterior Walls: Masonry veneer and exterior insulation and finish system on CMU back-up. Roof: Fully adhered thermoplastic sheet roofing (new and existing). Partitions: CMU and gypsum board systems. Fire Protection: Fully sprinkled. Plumbing: Standard and detention grade fixtures. HVAC Systems: Rooftop HVAC units, Temperature controls Other Electrical Systems: Power and lighting, Telephone, Fire alarm and detection Security Electronics: CCTV Door control and monitoring Intercom Control consoles Uninterruptible power supply.
    Gering, Nebraska $3,200,000 Reilly Johnson Architecture This email address is being protected from spambots. You need JavaScript enabled to view it. Link